Before you start
Adults aged 18 or over with WR1 competence or an approved evidence-based recognition route covering every WR1 outcome; current relevant first aid; recent river experience; and demonstrated swimming, self-rescue and equipment capability appropriate to the proposed WR2 venue. The instructor records the prerequisite review and practical entry check before higher-exposure tasks. Gaps require learning and fresh observation, not a signed waiver.
- Submit WR1 or equivalent evidence and recent river practice for review before attendance.
- Review the WR2 scope, method-learning prerequisites and venue information; identify unfamiliar equipment or craft in advance.
- Prepare current first-aid evidence and privately discuss any functional support needs.
- Bring approved equipment only as agreed; the instructor must check suitability and compatibility before use.
- Expect both individual tasks and team scenarios with role rotation. Be ready to explain why a method is suitable and when it must stop.
Venue and staffing
An inspected, approved river reach offering the required task features with reliable access, exit options, communications and independent rescue provision. The local technical plan records the actual conditions and upper/lower operating limits. Tasks involving tethered contact, non-powered craft or water rope systems need their own approved setup and safety plan. If the venue cannot safely support a required practical task, defer that evidence or use another approved venue; do not award a narrower demonstration as unrestricted competence.
A current Rescue Education water instructor authorised for WR2 and each included method leads practice. Credential assessment is by a separately authorised water assessor under the scheme independence policy. Each active exposure has named competent backup capable of immediate intervention, appropriate casualty care and evacuation resources. Instructors and assessors must not be so occupied that safety cover or individual observation fails. The approved exercise risk assessment determines and records group size and staff deployment; no universal ratio is assumed.
Equipment preparation
- WR1 personal and group safety equipment appropriate to the reach
- Approved water-specific rescue lines, connectors, compatible anchors and control equipment
- Task-appropriate releasable rescue equipment where a validated contact method requires it
- Non-powered craft and rescue accessories only where that method is in the programme and staff scope
- Casualty packaging and handling equipment suitable for the approved environment
- Training mannequins and dry entrapment props
- Reliable communications, independent rescue provision and appropriate medical/thermal resources
- Current method sheets, manufacturer instructions, venue plan and individual assessment records
Critical safety controls
- A named, authorised water instructor accepts the current programme, exercise method sheets and venue plan before delivery. These draft outcomes do not themselves approve an operational technique.
- Inspect the reach and downstream consequences immediately before each session. Record permitted conditions, access and escape points, forecast and upstream release information, water quality, temperature exposure controls and stop triggers. Suspend or relocate whenever the approved envelope is exceeded.
- Brief and rehearse the real emergency plan, stop signal, casualty access and communication fallback. Maintain dedicated competent safety cover with immediate rescue capability independent of the candidate being assessed.
- Begin any immersion activity with supervised familiarisation in an approved low-consequence setting. Check confidence, equipment fit and ability to stop or exit; offer a stop or alternative without coercion. Missing practical evidence still means not yet demonstrated.
- Use approved, compatible water equipment and manufacturer instructions. Verify personal equipment and quick-release arrangements where relevant before exposure; keep defective equipment out of service.
- Never deliberately trap a participant, induce unconsciousness, obstruct breathing, simulate drowning through distress, or create an uncontrolled rope or hydraulic hazard. Use dry props, tabletop injects or suitable training mannequins for dangerous casualty states.
- Do not deliberately expose learners to natural strainers, undercuts, recirculating hydraulics, culverts, uncontrolled drops or contaminated floodwater. Recognition and avoidance can be assessed from a safe viewpoint or simulation.
- Manage loose line, entanglement and stored-energy hazards. A generic climbing rope method or ordinary harness connection is not automatically suitable for moving water. Any water-contact tether task needs a separately approved equipment, release and backup plan.
- Protect participants from cold, heat, exhaustion and repeated immersion through suitable clothing, rest, monitoring and an accessible exit. A rushed timetable never overrides individual readiness.
- Medical teaching stays within the instructor’s verified remit and current local guidance. Provide appropriate first-aid cover and a clear route to emergency medical assistance.
- An assessor’s safety intervention ends that attempt for the affected outcome. Record what happened, practise the gap and observe a fresh attempt; do not mark a coached rescue as an independent pass.
- Protect the environment through access permission, appropriate footwear and kit cleaning, biosecurity and lawful waste disposal. Record significant incidents and equipment defects through the scheme process.
- Before WR2 exposure, verify all prerequisite outcomes and the candidate’s practical entry capability. A certificate title alone does not establish the required river competence.
- A swimmer or contact rescuer enters only under a validated method and explicit task briefing with a viable exit, dedicated backup and a tested communication/release plan. Never tether a person using an improvised attachment arrangement.
- A rope system built near moving water must be assessed for water forces, line position, entanglement, release and downstream consequences as well as dry-land strength. Unverified force estimates or a generic mechanical-advantage ratio are not design approval.
- For craft work, the instructor and safety team must hold relevant craft competence and the method must be within the venue plan. Powered-craft operation is excluded. If required craft evidence cannot be completed safely, record it as outstanding.
- Assessment scenarios introduce changing facts through controlled injects. They must not cause a real failed anchor, lost safety cover, trapped participant, unconscious swimmer or uncontrolled release.
- Name the responsible scheme and local operational authority; record venue parameters and evaluator approval in the operating annex. Scheme approval does not replace employer or jurisdictional authorisation.
- For training with injury risk, arrange trained and equipped basic life-support cover and an effective emergency response. Any immediately dangerous exercise needs a separately approved rescue and intervention provision; never assume the teaching team alone is adequate.
Teach the whole syllabus · Practise · Demonstrate
Learning outcomes
There is no fixed teaching timetable. Allow the time each learner needs; any required assessment conditions or performance limits still apply. Previous learning can inform preparation, but a certificate requires current, observed evidence for every outcome. A team result never substitutes for an individual assessment.
WR2-A
Verify readiness and retain WR1 competence
Demonstrate current competence in the prerequisite personal-safety and shore-response tasks, identify gaps and act within verified limitations before undertaking WR2 work.
Demonstration conditions
Evidence review plus an observed entry check in the approved setting. All WR1 outcomes are accounted for through current evidence or fresh observation.
Evidence of learning
A signed prerequisite map records issuer checks, practical observations, gaps and their resolution before advanced exposure.
Problem to work through
A current-looking external certificate has unclear scope or the candidate cannot demonstrate a critical personal skill.
Controlled outcome reference: WR2-A. Applicable standards and validation evidence are maintained in the technical file.
WR2-B
Develop a team rescue plan and fallback
Assess casualty needs, river hazards, access, downstream consequences and available competence; select a proportionate primary plan and a realistic fallback with clear roles and stop conditions.
Demonstration conditions
An unfamiliar approved river problem with enough information to plan and a deliberate information gap requiring clarification.
Evidence of learning
Candidate briefs a coherent plan, identifies missing resources and changes or rejects the plan when necessary.
Problem to work through
The fastest-looking method needs a capability the team does not hold.
Controlled outcome reference: WR2-B. Applicable standards and validation evidence are maintained in the technical file.
WR2-C
Establish and maintain a river safety system
Position and coordinate the competent safety team, identify rescue and escape options, confirm communication and monitor whether the safety arrangement remains effective.
Demonstration conditions
Approved exercise with named independent backup; candidates practise coordination without becoming the sole safety cover.
Evidence of learning
Observation records an effective initial brief, monitoring and prompt suspension or repositioning before exposure continues.
Problem to work through
A safety position loses sight of the working area or an exit is no longer usable.
Controlled outcome reference: WR2-C. Applicable standards and validation evidence are maintained in the technical file.
WR2-D
Move and self-rescue within the approved river setting
Demonstrate the approved swimming, manoeuvring and exit skills needed for the assessed reach while managing energy, communication and exposure. Recognise when a task exceeds personal capability.
Demonstration conditions
After familiarisation, individually observed tasks in the validated reach with dedicated safety cover and exposure limits.
Evidence of learning
Individual record identifies actual features and conditions, successful performance and any intervention. No unassessed river grade is implied.
Problem to work through
The candidate must select an alternative approved exit from a pre-briefed change, rather than persist with a poor route.
Controlled outcome reference: WR2-D. Applicable standards and validation evidence are maintained in the technical file.
WR2-E
Coordinate bank-based and shallow-water options
Choose and execute an approved bank-based or shallow-water intervention where it reduces exposure, maintaining team stability, line awareness and a planned retreat.
Demonstration conditions
A validated low-consequence task. Any shallow-water entry is separately approved for the actual footing, flow, depth and backup arrangements.
Evidence of learning
Candidate selects a justified method, demonstrates it within limits and recognises the point to retreat.
Problem to work through
A seemingly easy crossing or reaching position is rejected because footing or downstream consequences cannot be verified.
Controlled outcome reference: WR2-E. Applicable standards and validation evidence are maintained in the technical file.
WR2-F
Perform an approved in-water contact rescue
Use a validated contact method to approach, communicate with and assist a casualty to the planned safe location while maintaining rescuer control and the ability to abort.
Demonstration conditions
Only a controlled competent role player or suitable mannequin, approved equipment and method, clear exit and dedicated independent rescue cover. No simulated unconscious live swimmer or intentional panic behaviour.
Evidence of learning
Direct observation of the approved task and a safe response to the changed fact, including justified abort or escalation.
Problem to work through
A casualty cannot follow the expected instructions or the planned exit becomes unavailable through a scenario inject.
Controlled outcome reference: WR2-F. Applicable standards and validation evidence are maintained in the technical file.
WR2-G
Manage a validated tethered rescue task
Explain why a tethered method is justified, verify water-specific equipment and release arrangements, coordinate the tender and backup team and perform the approved task without losing line or rescuer control.
Demonstration conditions
A separately approved tethered exercise using manufacturer-compatible rescue equipment, rehearsed release and recovery, dedicated backup and a safe operating envelope. Dry rehearsal precedes water exposure.
Evidence of learning
Individual evidence covers the candidate’s rescuer and support roles, checks, communications and controlled response; any critical intervention requires reassessment.
Problem to work through
A communication signal is missed or line position becomes unsuitable; the team must stop or recover using the rehearsed plan.
Controlled outcome reference: WR2-G. Applicable standards and validation evidence are maintained in the technical file.
WR2-H
Select and verify water-specific anchors and rope systems
Choose an approved system suited to the task, explain its load path and foreseeable movement, check compatibility and protect people from line, edge and stored-energy hazards.
Demonstration conditions
Dry inspection and controlled practical setup using validated design limits and manufacturer information; no improvised live testing of unknown capacity.
Evidence of learning
Candidate identifies the unacceptable feature, selects a defensible alternative and completes a documented system check.
Problem to work through
A convenient anchor cannot be verified or a planned line crosses an occupied swimming area.
Controlled outcome reference: WR2-H. Applicable standards and validation evidence are maintained in the technical file.
WR2-I
Operate a controlled river rope intervention
Coordinate the approved movement or stabilisation task with clear commands, safe line management, monitoring and a workable stop/release plan. Maintain casualty and rescuer protection throughout.
Demonstration conditions
A validated river exercise selected by the technical lead, preceded by dry rehearsal and backed by independent safety provision. Only systems included in the approved WR2 method register count.
Evidence of learning
Assessor records individual roles, checks, decisions and controlled execution. Team completion does not replace individual evidence.
Problem to work through
A change in alignment or communication requires a controlled stop and reassessment.
Controlled outcome reference: WR2-I. Applicable standards and validation evidence are maintained in the technical file.
WR2-J
Plan an entrapment response without creating further victims
Gather reliable information, distinguish casualty entrapment from equipment pinning, identify immediate exposure and select a proportionate plan within available competence and equipment.
Demonstration conditions
Dry props, maps or mannequins only for trapped-casualty tasks; never deliberate live entrapment or an uncontrolled loaded release.
Evidence of learning
Candidate revises the plan, protects the team and explains limits. Any practical release task uses an approved controlled simulation.
Problem to work through
The first report says a person is pinned, but further information changes the location or casualty state.
Controlled outcome reference: WR2-J. Applicable standards and validation evidence are maintained in the technical file.
WR2-K
Use non-powered craft within a rescue plan
Prepare and operate the approved non-powered craft as part of a controlled river rescue task, demonstrating the prescribed operating and rescue roles, communication, stability, positioning, line awareness and recovery plan within the recorded scope.
Demonstration conditions
A mandatory practical exercise using the craft type, roles and task fixed in the versioned approved method register, with competent craft staff, suitable equipment, validated venue conditions and independent rescue capability. If this exercise cannot be delivered safely, record the outcome as outstanding and withhold the WR2 pass.
Evidence of learning
Direct observation of preparation, communication, controlled task and recovery; a tabletop discussion alone does not satisfy required craft performance.
Problem to work through
The craft cannot reach or hold the planned position, so the candidate must choose an alternative or stop.
Controlled outcome reference: WR2-K. Applicable standards and validation evidence are maintained in the technical file.
WR2-L
Recover and transfer a casualty safely
Protect the casualty during exit, handling and transfer, communicate with them where possible, monitor relevant changes and arrange timely medical handover within first-aid competence.
Demonstration conditions
A controlled role player or mannequin with approved handling equipment and a safe bank transfer route. Hazardous casualty states are described verbally.
Evidence of learning
Assessor records safe handling, justified route change, communication and a concise medical handover.
Problem to work through
The usual bank exit becomes unsuitable or the casualty’s reported condition changes.
Controlled outcome reference: WR2-L. Applicable standards and validation evidence are maintained in the technical file.
WR2-M
Respond to changing conditions and out-of-scope incidents
Recognise loss of the approved operating envelope, stop or revise activity, maintain accountability and request appropriate specialist resources. Identify explicit limits involving floodwater, vehicles, culverts and other excluded environments.
Demonstration conditions
A controlled scenario inject and a separate tabletop specialist incident. Real deterioration always stops the training exercise.
Evidence of learning
Candidate makes a defensible stop, replan or referral decision and briefs the team without attempting an excluded task.
Problem to work through
A rising-water report arrives during a rescue, or the task changes to a vehicle near a culvert.
Controlled outcome reference: WR2-M. Applicable standards and validation evidence are maintained in the technical file.
WR2-N
Complete and review an integrated team river rescue
Integrate planning, personal safety, technical work, communication and casualty handover in an unfamiliar approved problem, then complete records, equipment checks and a useful debrief.
Demonstration conditions
At least two contrasting controlled scenarios with individual role rotation and sufficient observation to cover every required outcome. The technical lead validates the scenario selection and evidence sufficiency.
Evidence of learning
Assessor records individual outcome evidence, conditions, task roles, interventions and rationale for the decision; unresolved critical gaps prevent a pass.
Problem to work through
A resource constraint or changed casualty information requires a safe revision rather than rote completion of the original plan.
Controlled outcome reference: WR2-N. Applicable standards and validation evidence are maintained in the technical file.
Scenario practice and assessment
Brief the problem and safe working boundary. Let the learner explain their plan, carry it out within the approved exercise and respond to a controlled variation. Stop immediately if protection or rescue provision becomes uncertain. No surprise removal of a real safety control.
WR2-S1
Separated swimmer and equipment
A group incident leaves a swimmer and loose equipment in different locations while the usual access point is blocked.
What to demonstrate
Priorities, task and safety planning, bank-based versus contact options, accountability, communications and casualty recovery.
Exercise controls
Use an approved controlled swimmer or mannequin arrangement. Equipment position and blocked access may be described rather than physically created. Dedicated safety cover remains outside the candidate team.
WR2-S2
Contact plan with a changed exit
A planned contact rescue becomes unsuitable when new information removes the preferred exit.
What to demonstrate
Reassessment, safe abort or alternative, tether/line awareness where included, team communication and casualty protection.
Exercise controls
The actual backup exit remains open. The change is a scenario inject, never a physical obstruction imposed after a live rescuer commits.
WR2-S3
Uncertain entrapment report
A report of a pinned paddler is incomplete and the first proposed rope system would expose helpers to stored energy.
What to demonstrate
Information gathering, casualty priorities, system reasoning, exclusion zones, specialist limits and revised plan.
Exercise controls
Use dry props or a mannequin. No live person is trapped, no unknown anchor is loaded and no uncontrolled release is performed.
WR2-S4
Craft cannot hold the planned position
A non-powered craft rescue is considered but the planned position is unsuitable for the actual conditions.
What to demonstrate
Craft suitability, team competence, alternative methods, communication and no-go judgement.
Exercise controls
Inspect and brief before commitment. Use a controlled practical task or pre-entry inject, not a deliberate capsize or uncontrolled line attachment.
WR2-S5
Multiple people and worsening conditions
Several people need accounting for while a rising-water report and a communication problem affect the original plan.
What to demonstrate
Leadership within role, revised limits, allocation of resources, casualty handover and escalation.
Exercise controls
All participants remain accounted for by exercise control. Worsening conditions are simulated; real deterioration ends the exercise.
WR2-S6
Flooded vehicle near a culvert
The team is asked to extend a river rescue into a flooded road and vehicle incident near a culvert.
What to demonstrate
Recognition of excluded scope, safe information gathering, prevention of further exposure and request for specialist resources.
Exercise controls
Tabletop only. This scenario tests boundaries and cannot be used as evidence of vehicle, flood or culvert rescue competence.