RESCUE EDUCATIONRR2Student pack

RR2 / Student pack / v0.1

Rope Rescue 2 — Vertical team rescue

A technical team-member award for vertical casualty movement, edge management and approved access/rescue transitions, within the recorded environment.

Technical review edition. Independent Rescue Education credential. External standards inform the mapping; no external accreditation or equivalence is claimed.

Before you start

Current RR1 or a documented equivalent accepted by a qualified technical reviewer, followed by an observed prerequisite check. Current first aid/CPR. Evidence of consolidation of RR1 skills in the intended environment. A missing prerequisite outcome requires teaching and assessment rather than a paper exemption.

Venue and staffing

A controlled vertical training venue with verified anchors, safe edge access, adequate clearance and a rehearsed participant recovery plan. Provide a manufactured high directional where the approved syllabus requires one. Record actual assessed environments; do not infer natural-terrain competence from a tower alone.

Draft delivery rule: one named instructor approved for this discipline/level and a separate competent safety/rescue person for exposed activity. Each active exposed evolution must be directly supervised; the supervisor must not simultaneously assess or supervise another evolution that prevents immediate intervention. The venue annex must set the maximum participants and simultaneous activities after risk review. Final assessment is by a separately approved independent assessor, with dedicated safety cover; availability of staff is verified before opening the session.

Equipment preparation

Critical safety controls

Teach the whole syllabus · Practise · Demonstrate

Learning outcomes

There is no fixed teaching timetable. Allow the time each learner needs; any required assessment conditions or performance limits still apply. Previous learning can inform preparation, but a certificate requires current, observed evidence for every outcome. A team result never substitutes for an individual assessment.

RR2-A

Vertical rescue analysis

Plan vertical movement using load-path and failure analysis, recoverability, appropriate anchors and equipment limitations. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Compare two rescue plans, identify resultant forces and justify the chosen contingency. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

A proposed redirect changes the anchor loading and obstructs recovery. Challenge the plan.

Controlled outcome reference: RR2-A. Applicable standards and validation evidence are maintained in the technical file.

RR2-B

Vertical raise and lower

Construct and operate controlled vertical movement with the approved safety architecture and a recoverable stopping state. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Individual rigging and control of both directions; simulated casualty or approved test mass. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

The preferred direction becomes unavailable after the load is committed. Stop and explain options.

Controlled outcome reference: RR2-B. Applicable standards and validation evidence are maintained in the technical file.

RR2-C

Change the movement plan

Change from raising to lowering and back while preserving casualty support and system integrity. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Observed loaded transitions with explanations of the active support and backup at each stage. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

The casualty must move back to a safe landing rather than continue. Change mode under control.

Controlled outcome reference: RR2-C. Applicable standards and validation evidence are maintained in the technical file.

RR2-D

Manage knots and obstructions

Negotiate a knot in personal movement and in rescue load systems without abandoning prescribed protection. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Separate individual evidence for ascent, descent, raise and lower transitions. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

A knot will arrive at a control device during an evacuation. Plan the transition before it reaches the device.

Controlled outcome reference: RR2-D. Applicable standards and validation evidence are maintained in the technical file.

RR2-E

Vertical casualty and edge management

Rig casualty and attendant attachments and manage a carrier across an edge with controlled orientation and continuous protection. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Candidate leads an edge transition and separately demonstrates personal ascent and descent edge negotiation. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

The carrier catches on the edge and the attendant loses useful positioning. Stop and reset safely.

Controlled outcome reference: RR2-E. Applicable standards and validation evidence are maintained in the technical file.

RR2-F

Basic high directional

Use a manufactured high directional in an approved configuration and explain how loading and anchorage maintain its stability. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Plan, rig, check and observe a controlled change in load direction; use current manufacturer documentation. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

Moving the load changes the high directional resultant. Explain the consequence before operating.

Controlled outcome reference: RR2-F. Applicable standards and validation evidence are maintained in the technical file.

RR2-G

Access and assist a casualty

Plan a protected approach to a simulated unsecured casualty and transfer them to a controlled rescue system. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Assessed rescue using a protected manikin; account for total load, patient attachment and evacuation route. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

The casualty attachment is not where expected. Reassess access, restraint and transfer rather than improvise under load.

Controlled outcome reference: RR2-G. Applicable standards and validation evidence are maintained in the technical file.

RR2-H

Recovery and limited improvisation

Evaluate a retrievable system and an improvised casualty attachment without creating a premature-release or medical hazard. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Dry or low-consequence demonstration and explanation of limitations; no improvised attachment used for other live-load assessment. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

A proposed retrievable arrangement could release before everyone is safe. Identify the fault in a dry setup.

Controlled outcome reference: RR2-H. Applicable standards and validation evidence are maintained in the technical file.

RR2-I

Integrated vertical rescue

Work as a technical team member across a vertical rescue with a changed condition and a recoverable contingency. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Individual ratings across planning, operations, communication, patient protection and safe termination. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

A team member gives inconsistent status information during a vertical rescue. Re-establish a verified plan.

Controlled outcome reference: RR2-I. Applicable standards and validation evidence are maintained in the technical file.

RR2-J

Maintain and hand over a rescue system

Monitor equipment, personnel and patient exposure throughout a vertical operation; withdraw or quarantine a suspect component and hand over an accurate system status. Explain the decision, perform the task without coaching at final assessment and identify conditions that require stopping or escalation. All critical safety controls apply; a correct final setup does not excuse an unsafe transition.

Demonstration conditions

Use the programme-approved venue, current method register, compatible inspected equipment and independent safety arrangements. The assessor states the task and scope before starting; clarification is allowed, coaching is not. Use dry planning or controlled test loads first; exposed application follows the approved technical plan.

Evidence of learning

Scenario inject involving equipment damage or rescuer fatigue; log the action and transfer responsibility clearly. Record the date, venue/conditions, method edition, observable actions, decision rationale and assessor. A knowledge answer may supplement but not replace required practical observation.

Problem to work through

A rope section is reported damaged during the task. Stop, preserve control and manage the equipment decision.

Controlled outcome reference: RR2-J. Applicable standards and validation evidence are maintained in the technical file.

Scenario practice and assessment

Brief the problem and safe working boundary. Let the learner explain their plan, carry it out within the approved exercise and respond to a controlled variation. Stop immediately if protection or rescue provision becomes uncertain. No surprise removal of a real safety control.

RR2-S1

Casualty at a vertical edge

Recover a simulated casualty using a planned vertical system and controlled carrier transition.

What to demonstrate

Individual rigging, edge management, command, patient/attendant protection and controlled movement.

Exercise controls

Use approved manikin/load, edge protection and dedicated rescue cover; validate system before operation.

RR2-S2

Lowering must reverse

The intended landing is unavailable after the simulated load is committed.

What to demonstrate

Stop, reassess, change mode under control, communicate and recover to a safe location.

Exercise controls

Do not remove safeguards to simulate failure; the assessor injects a scenario change within the approved envelope.

RR2-S3

A difficult passage

A knot or edge obstacle requires a protected personal or load-system transition.

What to demonstrate

Separate evidence for relevant movement directions; maintain and explain protection throughout.

Exercise controls

Use tested training configuration, manageable load and independent recovery; no deliberate device damage or real rope defect.

How assessment works

  1. Your instructor checks entry evidence and records teaching and practice for every outcome.
  2. A separately approved assessor observes every outcome and scenario.
  3. A pass requires safe, independent individual evidence throughout.
  4. A competent, impartial scheme reviewer makes the certification decision. Submit the short course evaluation. Positive or critical feedback has the same effect on release.

The assessor must not have taught this discipline and level to you in the preceding six months and must resolve relevant conflicts.

Ratings: I — independent and safe; C — coached or incomplete; N — not seen; S — safety intervention. No average score can compensate for a missing safety-critical outcome. A safe decision to stop and escalate can be correct evidence.

Reassessment and appeal

You receive the observed gaps and a targeted practice plan. Reassessment includes the affected outcomes and their interaction in a realistic scenario. You may raise an appeal from your private record. A reviewer with no part in the original decision must consider the evidence; the administrator records the outcome and preserves the history.

Maintaining currency

Proposed policy: practical reassessment before the three-year expiry against the current approved programme; review logged practice, changes in equipment/methods and any long absence. Online revision or a declaration alone does not renew a practical award. Earlier records remain intact; expired or withdrawn awards are shown accurately in verification. Extra practice and an observed return-to-activity check are required after a material skills lapse. Separately from award expiry, the standards-target delivery model requires an annual observed competency review by an approved evaluator, with dated individual evidence, current method references and next review due. A practice log or unexpired certificate alone is not proof of operational currency. Record any employer or jurisdictional authority requirements separately. This policy and the review mechanism require validation before launch.

Proposed award validity: 3 years from assessment, subject to technical approval. The certificate records the exact assessed scope; it does not authorise an employer’s operations or confer instructor status.

Standards and source mapping

These are original Rescue Education materials. They are informed by the source register and selected existing standards. Mapping is a documented comparison, not endorsement, accreditation or a claim that all requirements of another scheme are met.

Open source register

Pack generated from the same controlled programme record used by the assessment portal. Edition 0.1 · Content reference 31cc0e65417a.